+86-13233806514

Maintenance Schedule for a Multi-Deck Vibrating Screen

2026-11-24 14:49:500

A multi-deck vibrating screen has more wear points than a single-deck machine, so maintenance should follow a fixed schedule rather than waiting for a fault. Each shift: clear the screen surfaces and check that every discharge outlet flows freely. Weekly: verify screen tension on all decks, tighten clamp rings and inspect sealing gaskets for hardening. Monthly: check vibration motor bearings for temperature rise and noise, replenish grease to the specified interval, and examine bouncing balls and perforated plates for wear. Yearly: inspect the base frame welds and replace resilient mounts as a set. Recording bearing temperature trend is the simplest early warning for motor problems. Tianteng Machinery provides maintenance schedules for each delivered model and stocks common wear parts.

Send Inquiry